EasyManua.ls Logo

Lenze MDFQA 100 - 6 Commissioning; Before Switching on

Lenze MDFQA 100
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Before switching on
6
40
BA33.0001 EN 2.0
6 Commissioning
6.1 Before switching on
Before the initial commissioning, before commissioning after an extended standstill time
or before commissioning after an overhaul of the motor, you must check the following:
ƒ
Are all screwed connections of the mechanical and electrical parts firmly tightened?
ƒ
Is the unrestricted cooling-air inlet and outlet ensured?
ƒ
Are the protective devices against overheating (thermal sensor evaluation) effective?
ƒ
Is the drive controller correctly parameterised for the motor?
(
E
Drive controller operating instructions)
ƒ
Are the electrical connections o.k.?
ƒ
Does the motor connection have the correct phase sequence?
ƒ
Are rotating parts and surfaces, which can become very hot, protected against
touching?
ƒ
Is the permanent lubrication connected?
Danger!
Built-in brakes are not fail-safe brakes!

Table of Contents

Related product manuals