EasyManua.ls Logo

Level Sense Pro - Device and Alarm Testing; Maintenance

Level Sense Pro
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.0 Device and Alarm Testing
The Level Sense Pro and sensors should be tested monthly to ensure
proper operation.
8.1 Humidity and Temperature Testing
Testing for temperature and humidity sensors is done by comparing
current levels in Portal with a calibrated reference. Readings of +/-3%
are expected.
8.2 Float Switch Testing
Test the oat switch by holding the oat up, simulating high water,
and waiting for alarm. Release the oat after testing.
8.3 Leak Sensor Testing
Test the leak sensor by dipping both metal tabs of the sensor into
a cup of water and waiting for alarm. Do not submerge the plastic
housing of the sensor. Dry the metal tabs and replace the sensor
after testing.
8.4 Power Loss Detection Testing
Test power loss detection by removing the power adapter from the
wall and waiting for alarm. Reconnect the power adapter after testing.
8.5 Battery Condition Testing
Remove the power adapter from the wall and allow the device to run
for three hours on the internal battery pack. If the device turns o
before three hours replace the battery. Dispose battery according to
local rules and regulations.
9.0 Maintenance
Level Sense Pro and sensors require the following monthly
maintenance steps. Wipe the control o with a damp cloth.
Inspect the leak sensor contacts for corrosion and clean or replace
if necessary. Check the oat sensor can travel freely.
Check the level sensor has not come loose from the
PVC pipe. Check for fraying wire, loose connections
or other general wear and replace if necessary.
15

Related product manuals