TEST RUNNING
15
ENGLISH
1 Precautions in test running
- The initial power supply must provide at
least 90% of the rated voltage.
Otherwise, the air conditioner should not
be operated.
- The test run is started by pressing the
room temperature checking button and
down timer button for 3 seconds at the
same time.
- To cancel the test run, press any button.
- After completing work, be sure to meas-
ure and record trial run properties, and
store measured data, etc.
- Measuring items are room temperature,
outside temperature, suction tempera-
ture, blow out temperature, wind velocity,
wind volume, voltage, current, presence
of abnormal vibration and noise, operating
pressure, piping temperature, compres-
sive pressure.
- As to the structure and appearance,
check following items.
* Is the circulation of air adequate?
* Is the draining smooth?
* Is the heat insulation complete
(refrigerant and drain piping)?
* Is there any leakage of refrigerant?
* Is the remote controller switch oper-
ated?
* Is there any faulty wiring?
* Are not terminal screws loosened?
M4......118N.cm{12kgf.cm}
M5......196N.cm{20kgf.cm}
M6......245N.cm{25kgf.cm}
M8......588N.cm{60kgf.cm}
2 Connection of power supply
- Connect the power supply cord to the in-
dependent power supply.
*Circuit breaker is required.
- Operate the unit for fifteen minutes or
more.
3 Evaluation of the performance
- Measure the temperature of the intake
and discharge air.
- Ensure the difference between the intake
temperature and the discharge one is
more than 8°C (Cooling) or reversely
(Heating).
TEST RUNNING
CHECK THE FOLLOWING
ITEMS WHEN INSTALLATION IS
COMPLETE
Thermometer
CAUTION
• For test run, carry out the cooling op-
eration firstly even during heating sea-
son. If heating operation is carried out
firstly, it leads to the trouble of com-
pressor. Then attention must be paid.
• Carry out the test run more than 5
minutes without fail.(Test run will be
cancelled 18 minutes later automati-
cally)
!