EasyManua.ls Logo

LG CORDZERO A9 K - Installing the Charging Station

LG CORDZERO A9 K
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
INSTALLATION
EN
Installing the Charging
Station
Self-Standing Installation
Follow the steps below to install the charging
station on a hard and level floor.
1
Place the floor stand dock on a hard and level
floor and assemble the floor stand pipe.
2
Clip the power cord tidily into the cord keeper
a
on the back of the floor stand pipe.
3
Slide the detachable nozzle storage onto the
floor stand pipe.
Make sure not to pinch or tangle the power
cord behind the mop pads storage.
4
Assemble the charging station onto the top of
the floor stand pipe.
5
Connect the power adapter to the port on the
back of the charging station.
6
Drill a hole in the wall and insert the drywall
anchor
b
if needed.
Before drilling, make sure that there are no
pipes or electrical wires inside the wall at the
desired location.
For drywall anchor: use 1/4 (6.5 mm) drill bit
For concrete or wall stud: use 1/8 (3 mm)
drill bit
If screwing into drywall, use the drywall
anchor.
7
Align the wall anchoring block
c
of the
chanrging station, and fix the charging station
global_main.book.book Page 16 Monday, July 13, 2020 4:53 PM

Table of Contents

Related product manuals