EasyManua.ls Logo

LG EEV Kit - EEV Kit Installation; Pipe Cutting

LG EEV Kit
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
EEV KIT INSTALLATION
ENGLISH
pipe cutting
1 Be sure to use a copper pipe cutter for the pipe cutting.
2 Remove any burrs.
(When cutting, have the pipe end tilted downward so that any burrs do not get inside of the
pipe.)
Copper
pipe cutter
90°
Incline Roughness
Pipe
Copper
pipe cutter
90°
Incline Roughness
Pipe
CAUTION
• Cut the cutting area in a straight line.
!
CAUTION
• The presence of burrs can result in refrigerant leakage, so be sure to remove any burrs
with a reamer.
• Cutting dust could lead to malfunctioning if it gets inside the pipe.
!

Related product manuals