EasyManua.ls Logo

LG F3000 - Procedure

LG F3000
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11. AUTO CALIBRATION
- 123 -
1. Connect as Fig 6-2(RS232 serial cable is connected between COM port of PC and MON port of
TEST JIG, in general)
2. Set the Power Supply 4.0V
3. Set the 3
rd
, 4
th
of DIP SW ON state always
4. Press the Phone power key, if the Remote ON is used, 1st ON state
11.4 Procedure
1. Connect as Fig 11-2 (RS232 serial cable is connected between COM port of PC and MON port of
TEST JIG, in general.)
2. Run Hot_Kimchi.exe to start calibration.
3. From the Calibration Lib menu, Select F3000, then, Press APPLY!
(3)

Other manuals for LG F3000

Related product manuals