7
■ Construct the cabinet work in accordance with these dimensions to guarantee
adequate ventilation for reliable heat exchange for product.
1. There must be unobstructed pathways
for air circulation to enter through
bottom inlet and escape through upper
outlet.
2. Ensure that No. ¡ path can be
obtained in the cases where the No. ¨
path cannot be used.
3. Ensure that the surface area of the inlet
and outlet ports for the No. ¨, ¡ air
paths are more than 200cm
2
.
5. Installing the built-in refrigerator
■ Floor plan of cabinet and the maximum opening of the door
Required conditions for base of cabinet.
- Bottom surface :
It is required to use T 20mm to obtain strength.
- Space stand :
Ensure that the base is reinforced to the extent
that it can support up to 200KG (Product + Food
+ Integrated Cabinet Doors + Shock of opening
and closing doors)
- Level :
The base must be level to assure the uniform
downward pressure and distribution of weight to
alleviate warping of the base. Warping may
hinder the operation of the products doors.
- Securely fix the side panel of the cabinet to the wall or adjacent cabinet. Because the product is anchored
to the cabinet with the screws from the hinge, make sure the side panel thickness is 30mm or more.
(Additionally, If the fridge and freezer are installed side by side, make sure an additional panel of 15mm is
added between them to assure a combined thickness of 30mm between them.) If the side panel is to thin,
the products may be damaged if the screws pass through the panels and touch the other fridge/freezer.
Caution
Caution