EasyManua.ls Logo

LG LB-E608HL - Ceiling Mount and Bolt Placement; Indoor Unit Ceiling Installation

LG LB-E608HL
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
–14–
A
B
C
1~3mm
Drainage hole
M10 Nut
M10 SP. washer
M10 washer
D
E
X 4
X 4
(Local
supply)
X 4
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4
(Local
supply)
X 4
2. Ceiling dimensions and hanging bolt location
Installation of Unit
Install the unit above the ceiling correctly.
• Apply a joint-canvas between the unit and duct to
absorb unnecessary vibration.
• Apply a filter Accessory at air return hole.
• Install the unit leaning to a drainage hole side as a
figure for easy water drainage.
• A place where the unit will be leveled and that can
support the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
CASE 1
POSITION OF SUSPENSION BOLT
CASE 2
POSITION OF CONSOLE BOLT
(Unit:mm)
Dimension
Capacity
60K
BTU
A B C D E
1292 1230 650.5 54 680

Related product manuals