EasyManua.ls Logo

LG LB-E608HL - Piping Connection and Vacuum Drying; Pipe Joining and System Drying

LG LB-E608HL
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
–20–
1. Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in hard-
ening the pipe.)
2. After deforming the piping, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
3. Connect pipe to the service valve or ball valve
which is located below the outdoor unit.
4. After completing the piping connection, be sure
to check if there is gas leakage in indoor and
outdoor connection.
After completing the piping connection, execute
vacuum drying for the connecting piping and the
indoor unit.
The vacuum drying must be carried out using the
service ports of both the liquid and gas side valves.
Use two wrenches and tighten with regular torque.
Outdoor
unit
Liquid side
Flare connection
Flare connection
Gas side
Indoor
unit
Union
Piping Connection
Vacuum drying
CAUTION
Model Liquid side piping Gas side piping
60K BTU 1/2" 3/4"
Pipe size Torque
3/8" 4.2kg.m
1/2" 5.5kg.m
5/8" 6.6kg.m
3/4" 6.6kg.m
Liquid Side
Gas Side

Related product manuals