INSTALLATION
INSTRUCTIONS
»
8.
CHECK
OPERATION
OF
BAKE/BROIL
BURNERS
To
check
ignition
of
the
Bake
burner,
follow
the
steps
To
check
ignition
of
the
Broil
burner,
follow
the
steps
below:
below:
1)
Remove
all
packing
from
inside
the
oven
cavity.
1)
Press
"Broil"
("Hi"
will
be
shown
in
the
display).
2)
Press
"Bake"
(350
will
be
shown
in
the
display).
2)
Make
sure
the
door
is
closed.
3)
Press
Start.
3)
Press
Start.
it
may
take
between
30
and
90
seconds
for
the
burner
It
may
take
between
30
and
90
seconds
for
the
burner
to
start
heating.
to
start
heating.
NOTE:
Do
not
try
and
light
either
the
bake
or
broil
burners
during
a
power
outage. The
range
has
an
electrical
ignition
system
and
can
not
be
used
without
power.
»
9.
AIR
SHUTTER
ADJUSTMENT
FOR
BAKE
AND
BROIL
BURNERS.
The
range
comes
from
the
factory
with
air
shutters
adjusted
for
proper
air
flow
for
natural
gas.
if
converted
to
LP,
follow
the
instructions
provided
in
the
conversion
kit
to
properly
adjust
the
air
shutters.
LP
conversion
must
be
performed
by
a
qualified
technician.
13
@

Other manuals for LG LDG3019ST

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG LDG3019ST and is the answer not in the manual?