LG LS-J0761HL - Pumping Down Procedure; Refrigerant Transfer Procedure

LG LS-J0761HL
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Pumping down
Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.
Remove the valve stem caps and confirm that
the valve stems are in the raised position.
Be sure to use a hexagonal wrench to operate
the valve stems.
(2) Operate the unit for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
Connect the charge hose with the push pin to
the service port.
(4) Air purging of the charge hose.
Open the low-pressure valve on the charge set
slightly to air purge from the charge hose.
(5) Set the 2-way valve to the closed position.
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
Do this quickly so that the gauge ends up
indicating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valve’s stem nuts and the
service port nut.
Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE