EasyManua.ls Logo

LG LS-L1261CL - Test Running

LG LS-L1261CL
67 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-33-
7. Test running
Discharge air
Bolt
Tubing
connection
Battery Cover
Settlement of Outdoor Unit
Anchor the outdoor unit with a bolt and nut
(ø10cm) tightly and horizontally on a concrete or
rigid mount.
When installing on the wall, roof or rooftop, anchor
the mounting base securely with a nail or wire
assuming the influence of wind and earthquake.
In the case when the vibration of the unit is con-
veyed to the house, settle the unit with an anti-
vibration rubber.
2) Evaluation of the performance
1. Measure the temperature of the intake and dis-
charge air.
2. Ensure the difference between the intake tem-
perature and the discharge one is more than 8
°C(Cooling) or reversely (Heating).
1) Connection of power supply
1. Connect the power supply cord to the inde-
pendent power supply.
Circuitbreaker is required.
2. Prepare the remote controller.
Remove the battery cover from the remote
controller according to the arrow direction.
Be sure that the provided batteries are new.
(Two "R03" or "AAA" dry-cell batteries or
equivalent.)
Be sure that the (+) and (-) directions are
correct.
Insert two batteries.
Slide the back cover back into position accord-
ing to the arrow direction.
3. Operate the unit for fifteen minutes or more.

Related product manuals