EasyManua.ls Logo

LG MICRO Hi-Fi SYSTEM - Base Main; Belt Loading; Frame Assembly Up;Down; Gear Loading

LG MICRO Hi-Fi SYSTEM
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-5
5.
Frame Assembly Up/Down (Fig. 4-4)
Note
Put the Base Main face down(Bottom Side)
1) Release the screw(S4)
2) Unlock the Locking Tab(L3) in direction of arrow
and then lift up the Frame Assembly Up/Down to
separate it from the Base Main.
Note
When reassembling move the Guide Up/Down
in direction of arrow(C) until it is positioned as
Fig.(C).
When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of the Guide
Up/Down as Fig.(B)
6. Belt Loading(Fig. 4-4)
Note
Put the Base Main on original position(Top Side)
7. Gear pulley (Fig. 4-4)
1) Unlock the Locking Tab(L4) in direction of arrow(B) and
then separate the Gear Pulley from the Base Main.
8. GEAR LOADING (FIG. 4-4)
9. GUIDE UP/DOWN (FIG. 4-4)
1) Move the Guide Up/Down in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
Note
When reassembling place the Guide Up/Down as Fig.(C)
and move it in direction arrow(B) until it is locked by the Locking
Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10.
PWB Assembly Loading (Fig. 4-4)
Note
Put the Base Main face down(Bottom Side)
1) Release 1 Screws(S5)
2) Unlock the Loading Motor (C2) from the Hook (H1) on
the Base Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB
Assembly Loading from the Base Main.
11. Base Main(Fig. 4-4)
GEAR LOADING
GEAR PULLEY
BELT LOADING
PWB ASSEMBLY LOADING
BASE MAIN
GUIDE UP/DOWN
GUIDE UP/DOWN
GUIDE UP/DOWN
UP/DOWN FRAME ASSEMBLY
GUIDE UP/DOWN
BASE MAIN
(L6)
(L4)
(L6)
(H1)
(C2)
(S5)
(S4)
(S4)
(A)
(A)
(B)
(B)
(C)
(L5)
FIG. (A)
FIG. (B)
FIG. (C)
(A)
(B)
Fig. 4-4
SCREW INSERTION
TORGUE CONTROL

Related product manuals