EasyManuals Logo

LG MULTI V MINI ARUN036GS2 User Manual

LG MULTI V MINI ARUN036GS2
67 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #53 background imageLoading...
Page #53 background image
ENGLISH
Installation Manual 53
Test Run
1. Test run should be performed after auto-addressing
2.
Test run can be performed when 3 minutes passed after power on, by DIP switches and buttons. -
needs time for initializing data of micom and readying communication with indoor unit.
3. 7-segment of outdoor unit displays test run status and error.
4. During test run, if error occurs, then test run ends and proceeds final stage of test run - sys-
tem should be initial status by initializing all data of test run pressing black button for 2 seconds after
all DIP switch off
5. In case of finishing test run during test run, press black and red button simultaneously for 5
seconds.
6. When test run is finished, indoor units are stopped and 938 is displayed after 90 seconds.
7. To perform FDD logic test, proceeds when 3 minutes passed after reset.
Step 0. Check order signal
Select the function of tust run
Step 1. Sensor checking
Check sensor abnormality.
Step 2. Refrigerant auto charging
In case of adding additional refrigerant, this function helps adding refrigerant automatically.
Step 3. Refrigerant checking
Check refrigerant amount is proper.
Test Run
Checks before Test Run
Test Run Procedure

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG MULTI V MINI ARUN036GS2 and is the answer not in the manual?

LG MULTI V MINI ARUN036GS2 Specifications

General IconGeneral
BrandLG
ModelMULTI V MINI ARUN036GS2
CategoryAir Conditioner
LanguageEnglish

Related product manuals