90
12-24. Problem with Drying #1
Do you hear noise from the comp 30 - 60 seconds
after turning on the power and starting the Drying
course?
Does the pipe temperature rise to 60 - 70 10 minutes after starting the
Drying course?
Check the temperature during operation.
Is the coil of LEV properly assembled?
Is the connector related to LEV properly assembled?
LEV connector (WH5), main PCB connector (NA5)
Check the connection of related harness connectors.
Comp connector (WH3), main PCB connector (RD3)
Check if the thermistor is properly
assembled.
Assemble the coil properly.
Connect the connector.
NO
NO
NO
NO
YES
YES
YES