EasyManua.ls Logo

Liebert HPC-S 022 - Page 40

Liebert HPC-S 022
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Application Consideration
10 -- 4
Liebert HPC---S 006---022---PD---273571---01.03.2012
Fig. 10c --- Lifting instructions with tubes
SPLIT PIN
(NOT SUPPLIED)
BLOCKING PEG
(NOT SUPPLIED)
N.B: Place the lifting tubes in the holes marked “LIFT HERE” on the base and block the ends of the tubes with pegs and split pins as in
PART . A .
The capacity of the lifting equipmentmust be sufficient for the load to b e lifted. Check the unitweight, the load capacity of the balance,
the chords and the quality of the above mentioned apparatus.
BEL T OR CHORD
LIFTING TUBE (NOT SUPPLIED)
(BASE HOLES Ø45)
PROTECTION
PLANK
RIGID STRUTS
(POSSIBLY STEEL)
PART. ”A”
”A”
”C”
”B”
Tab . 10f --- Lifting
Models Fans number
“A”
(m)
“B”
(m)
“C”
(m)
CB0 / FB0 006 --- 007
CG0/FG0006
1
1,7
3
8
CB0 / FB0 009 --- 011 --- 014 --- 015
CG0 / FG0 007 --- 009 --- 011
2
4
CB0 / FB0 018 --- 019 --- 022
CG0 / FG0 014 --- 015 --- 018
3

Related product manuals