IS 678 ECN 4993 Page 6 of 20
Do not connect directly to any flue, ducting or mechanical extraction system.
The gas supply hose or tubing shall comply with national requirements in force and
shall be periodically examined and replaced as necessary.
An equipotential bonding terminal is provided to allow cross bonding with other
equipment.
When making the connection to the supply, secure the hexagon on the rear fitting to
prevent rotation of internal pipe work.
Stability kit –fixing procedure Fig 2
The J5 model must be suitably fixed to the floor with the brackets provided.
Fig 2
Site the appliance in its intended position. Fit the upper brackets to the bottom of
the appliance using the screws provided.
Loosely fitting the lower brackets to the upper brackets, mark the floor through the
holes in the lower brackets.
Drill the floor as marked with a 7mm drill and fit the plugs provided to the holes.
Reposition the appliance and screw the lower brackets in place with the screws
provided.
Level the appliance and tighten the brackets together.