EasyManua.ls Logo

Link Controls CDO 100: 1:10-30 - Initial Operation; 6.1 Preparation and Connections

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Door Operator / STA / LC- 2973 Rev.H– 9
6. Initial Operation
6.1 Preparation
Warning!
To avoid damage to the operator, the
following points must be observed:
- The types of cable and their diameters
must be selected according to current
regulations.
- The nominal currents and the type of
connection must correspond to those on
the motor type plate.
- The drive details must agree with the
connected loads.
Information:
When operated with electronic control
units, the corresponding start-up
instructions and circuit diagrams must be
complied with.
6.2 Motor & Limit Switch Connections
Open the operator
Remove the cover from the operator.
Insert the cables
Feed the cables through the gland tting into the
operator.

Related product manuals