EasyManua.ls Logo

Litre Meter VFF Series - Handling and Shipping Procedures; Hazardous Area Certification; Field Wiring Connection & Output

Default Icon
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Document No LM0670 Issue A Rev 2 November 2017 Page 8 of 15
HANDLING AND SHIPPING PROCEDURES
The systems are packed entirely within wooden or cardboard boxes suitable for protecting the units
during normal handling. We would recommend that they are kept in these boxes for as long as is
practicable until they are finally required. One note of caution: please do not lift or handle the meters by
solely lifting the display, glands or cables. If the display cover is removed, we recommend maintaining
the humidity at less than 40% RH to prevent component corrosion.
HAZARDOUS AREA CERTIFICATION
Please consult the instrument manual for details.
FIELD WIRING CONNECTION & OUTPUT
Please see separate FlowPod Installation and Operating Manual LM0662 (or another
instrument manual)
Refer to drawing depending on what has been supplied. The correct drawing is supplied with each order
and can be accessed via the website url. The url is given on the quick start instructions and the outside
of the flowmeter and instrument.
FlowPod drawing:
C7310 2 wire or C7311 for 4 wire
VRGS drawing
Refer to drawing depending on what has been supplied. The correct drawing is supplied with each order
and can be accessed via the website url. The url is given on the quick start instructions and the outside
of the flowmeter and instrument.
Fluidwell drawing – see Appendix
Caution:
Meter disassembly, assembly, modification etc should only be carried out by
qualified personnel.