EasyManua.ls Logo

Lucent Technologies SLC 5 Series - Page 77

Lucent Technologies SLC 5 Series
508 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-205-401 Power Up: NTP-008
Issue 7, March 1997 Page 3 of 4
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
4.
NOTE:
Two
BFU
s are required to turn up each dual bank assembly;
one is needed for the dual bank assembly and the second
one is needed for the associated optical shelves. All 4
BFU
s
should be installed at this time.
DLP-510Install and check fuses in 4
BFU
s (bank fuse units) in optics
power shelf.
5.
NOTE:
Only
AUA11B
or later version
PCU
s should be installed in
optics power shelf.
DLP-530Install 8
PCU
s in optics power shelf.
DLP-5316. Install
A/FCU
(alarm/fan control unit) in optics power shelf.
DLP-5327. Install
AYB1B OU
s in optical shelf.
8. Update Office records.

Related product manuals