1. OPERATIONAL SAFETY
In the safety service scope, the transducer meets to requirements of the
EN 61010-1 standard.
Observations concerning the operational safety
l All operations concerning transport, installation, and commissioning
as well as maintenance, must be carried out by qualified, skilled
personnel, and national regulations for the prevention of accidents
must be observed.
l Before switching transducer on, one must check the correctness
of connections to the network.
l When connecting the supply, one must remember that a switch or
a circuit-breaker should be installed in the building. This switch
should be located near the device, easy accessible by the
operator, and suitably marked as an element switching the
transducer off.
l Do not connect the transducer to the network through
an autotransformer.
l Before removing the transducer housing, one must switch the
supply off and disconnect measuring circuits.
l The removal of the transducer housing during the guarantee
contract period may cause its cancellation.
l The programmer socket is only use to connect the PD14
programmer. After the transducer programming, one must
insert the hole plug.
l Non-authorized removal of the housing, inappropriate use, incorrect
installation or operation, creates the risk of injury to personnel
or a transducer damage.