EasyManua.ls Logo

mabe MEI18VR - Installation Procedures; Unit Installation Steps; Installation Assistance and Aids

mabe MEI18VR
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 6 -
Installation procedure:
1) Remove the sticker from the front panel.
3) Fill up space in the cabinet with sponge
or foam.
2) Put the unit into the installation hole.
 The installation hole should be strong
enough to and rigid bear the weight
the unit so that the unit will not bibrate
and make noise.
Installation assistance:

The installation hole should be stro-
ng enough to support the air condit-
ioner.
If not, iron support has to
be used
outdoors. Iron support sho-

A sunshade board can protect the air
conditioner from direct sunlight and any
falling objects from hitting the WAC. If
your WAC location does not come with
a proper coverage, please contact your
dealer to install a sunshade board. Do
not block the air inlet at the side grill
after the sunshade board is installed.
Wall
Wooden
frame
Sunshade
board
Rubber
plate
Support
Horizontal line

down to the back to make sure the
condensation water can be drained
away conveniently.(Slant about 3
(Shown at right figure.)
ȾȾ
1 )
ȾȾ
1 3
ȾȾ
1 3
ȾȾ
1 3
Inclined about

Related product manuals