Points to be checked during PDI
v Please check that the Gyrovator is properly installed.
v Operator manual cum parts catalogue along with warranty
booklet is provided at the time of delivery.
v All oil i.e. transmission, gearbox and rotor bearing should be
changed & then checked for level.
v All nut bolts checked for loose.
v Cardon shaft is properly arcaded, filed and greased.
v Center to center distance between two lower links is
maintained as per the details.
SLX 150 = 82.5 cm
SLX 175 = 82.5 cm
SLX 200 = 82.5 cm
v Category-II pins are provided with the implement.
v Depth adjuster is set as per required depth.
v Rotor rpm is set according to the field condition and required
pulverization.
v Trail board is fitted at a proper angle as explained in Operator
Manual/ Installation copy
1. List if any shortages parts :
_______________________________________________
_______________________________________________
_______________________________________________
2. Any damage to parts / assembly :
_______________________________________________
_______________________________________________
_______________________________________________
3. Any problem in fittment :
_______________________________________________
_______________________________________________
_______________________________________________
4. Any problem noticed while operating :
_______________________________________________
_______________________________________________
_______________________________________________
5. Any other feedback :
_______________________________________________
_______________________________________________
_______________________________________________
Points to be checked during PDI
v Please check that the Gyrovator is properly installed.
v Operator manual cum parts catalogue along with warranty
booklet is provided at the time of delivery.
v All oil i.e. transmission, gearbox and rotor bearing should be
changed & then checked for level.
v All nut bolts checked for loose.
v Cardon shaft is properly arcaded, filed and greased.
v Center to center distance between two lower links is
maintained as per the details.
SLX 150 = 82.5 cm
SLX 175 = 82.5 cm
SLX 200 = 82.5 cm
v Category-II pins are provided with the implement.
v Depth adjuster is set as per required depth.
v Rotor rpm is set according to the field condition and required
pulverization.
v Trail board is fitted at a proper angle as explained in Operator
Manual/ Installation copy
1. List if any shortages parts :
_______________________________________________
_______________________________________________
_______________________________________________
2. Any damage to parts / assembly :
_______________________________________________
_______________________________________________
_______________________________________________
3. Any problem in fittment :
_______________________________________________
_______________________________________________
_______________________________________________
4. Any problem noticed while operating :
_______________________________________________
_______________________________________________
_______________________________________________
5. Any other feedback :
_______________________________________________
_______________________________________________
_______________________________________________