Turbocharger
Maintenance / Cleaning
A5.05. 06.13.01.02
300
M20
en / 31.05.2010 IB002574 2/2
06
1.4 Close stop valves and corner valves and remove hose clip (1).
1.5 Run the turbocharger dry with a written engine load approx. 30 min., then increase engine load
slowly.
NOTE
Repeat washing procedure if vibrations and sounds appear at the turbocharger
which were previously not present.