EasyManua.ls Logo

Malyan M200 - F. Installation: Filament Setup; Loading Filament

Malyan M200
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 9 -
3 Install the filament rack on the left side of the machine and hang the
filament on the holder.
4 When the temperatures are ready, cut the top of filament to sharp
point, and then press down the feed mechanism, thread and push the
filament through to the mouth of the nozzle, stop pushing when the
filament comes out of the nozzle.

Related product manuals