SERVICE 1400H OPERATOR AND SERVICE MANUAL
5-24 Published 10-30-2014 Control # 040-09
the holes in these parts are offset from the center. The
hole are 0.06 in (1,5 mm) off center in the plate and 0.03
in (0,8 mm) off center in the wear pad. Various
combinations of rotation of these parts allow the
adjustment.
44. Install thick hoist attachment bar through hoist mount.
This bar anchors the 7/16 in (11,11 mm) extend cable
and serves as the upper hoist attachment point. Hold
this bar up in its slot with a spacer on each side. This will
facilitate easier assembly.
45. Install the threaded end of the 7/16 in (11,11 mm) extend
cable through hole in center of the hoist attachment bar.
46. Slightly tighten all cables. Cycle boom slowly to assure
proper operation before torquing cables. Refer to the
“Four Section Cable Tensioning” section to properly
torque the cables in the extend system. Cables must be
torqued to proper specifications for proper boom
operation.
47. Install hoist and anti-two block system.