SAFETY INFORMATION 1400H OPERATOR AND SERVICE MANUAL
1-32 Published 10-30-2014 Control # 040-09
Overload less than 25%
1
Stabilizer
Cylinders
Inspect for leaking.
2
Outrigger
Pads
Inspect for deformation and cracked welds.
Overload from 25% to 49%
1
Stabilizer
Cylinders
Inspect for leaking.
2
Outrigger
Pads
Inspect for deformation and cracked welds.
3
Outrigger
Beams
Inspect for deformation and cracked welds.
4
Outrigger
Boxes
Inspect for deformation and cracked welds.
5 Welds Inspect for cracks.
6 Paint
Inspect for cracked paint which could indicate twisted,
stretched, or compressed members.