EasyManua.ls Logo

Manitowoc S model - Page 31

Manitowoc S model
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roof Penetration
³ Prior to installation of the ice
machine head section and
CVD® condensing unit be
sure that the distance
between then is within the
line set routing guidelines.
Roof/Wall Penetration
³ If required, cut a 3-inch
(76.2 mm) circular hole in the
wall or roof for routing of
refrigeration tubing.
A qualified person must
perform all roof penetrations.
Verify Ice Machine and CVD® Condensing Unit Locations Are Within
Guidelines.

Other manuals for Manitowoc S model

Related product manuals