Leak Check the System
³ Leak check the new line set connections at the ice machine
head section, condensing unit and S trap as well as all factory
joints throughout the entire system.
³ Disconnect power to the CVD condensing unit. Place the
ICE/OFF/CLEAN toggle switch into the ICE position. This allows
the low side and high side pressures to equalize.
³ Place the ICE/OFF/CLEAN toggle switch in the OFF position.
Connect power to the CVD condensing unit and allow system to
pump down.