Marathon V-6030 User Manual

Marathon V-6030
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PLAY IT SAFE!
OPERATION, MAINTENANCE
AND INSTALLATION MANUAL
FOR
VERTICAL RECYCLER BALER
INCLUDING THESE MODELS:
V-4830 V-4830HD V-6030LP
V-6030 V-6030HD V-6042LP
V-7230HD
A
DOVER
INDUSTRIES COMPANY
Marathon Equipment Co. OMI Manual No. 0003, Rev. 01/01
VERNON, AL - YERINGTON, NV - CLEARFIELD, PA
LEEDS, AL - FAYETTE, AL
Question and Answer IconNeed help?

Do you have a question about the Marathon V-6030 and is the answer not in the manual?

Marathon V-6030 Specifications

General IconGeneral
BrandMarathon
ModelV-6030
CategoryLawn and Garden Equipment
LanguageEnglish

Summary

Introduction to Marathon Baler Operation

Safety Standards and Compliance

Lists applicable industry standards and safety requirements for baler operation.

Pre-Operating Safety Instructions

General Safety Precautions

Highlights critical safety warnings before operating the baler.

Controls for V-4830HD, V-6030HD, V-6030LP, & V-7230HD

Controls for V-6030 & V-4830

Controls for V-6042LP

Control Panel Description

Operating Instructions: Making a Bale

Making a Bale: HD & LP Units

Step-by-step guide for making bales on HD and LP baler models.

Making a Bale: V-6030 & V-4830

Instructions for baling operations on V-6030 and V-4830 models.

Operating Instructions: Bale Tie Off/Bale Eject for HD Models

Bale Tie Off & Eject Procedures (HD Models)

Detailed steps for tying off and ejecting bales on HD models.

Operating Instructions: Bale Tie Off/Bale Eject for V-6030LP

Bale Tie Off & Eject Procedures (V-6030LP)

Instructions for tying off and ejecting bales on the V-6030LP model.

Operating Instructions: Bale Tie Off/Bale Eject for V-6042LP

Bale Tie Off & Eject Procedures (V-6042LP)

Steps for tying off and ejecting bales on the V-6042LP model.

Operating Instructions: Bale Tie Off/Bale Eject for V-4830 & V-6030

Bale Tie Off & Eject Procedures (V-4830 & V-6030)

Procedure for tying off and ejecting bales on V-4830 and V-6030 models.

Lock-Out & Tag-Out Instructions

Electrical Lock-Out/Tag-Out Procedures

Steps for safely de-energizing electrical components before servicing.

Hydraulic Lock-Out/Tag-Out Procedures

Procedure for safely releasing stored hydraulic energy.

Supporting of Platen

Periodic Maintenance Schedule

Procedures: Pressure Setting & Interlock Testing

Procedures: Cylinder Removal

Procedures: Cylinder Rebuilding & Limit Switch Adjustment

Procedures: Feed Gate Latch Adjustment

Baler Specifications

Procedures: Timer Adjustment

Trouble-Shooting Chart

Off-Loading and Up-Ending of Baler

General Installation Guidelines

Electrical Installation Procedures

Start-Up Instructions