EasyManua.ls Logo

Marathon V-4830 User Manual

Marathon V-4830
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PLAY IT SAFE!
OPERATION, MAINTENANCE
AND INSTALLATION MANUAL
FOR
VERTICAL RECYCLER BALER
INCLUDING THESE MODELS:
V-4830 V-4830HD V-6030LP
V-6030 V-6030HD V-6042LP
V-7230HD
A
DOVER
INDUSTRIES COMPANY
Marathon Equipment Co. OMI Manual No. 0003, Rev. 01/01
VERNON, AL - YERINGTON, NV - CLEARFIELD, PA
LEEDS, AL - FAYETTE, AL
Question and Answer IconNeed help?

Do you have a question about the Marathon V-4830 and is the answer not in the manual?

Marathon V-4830 Specifications

General IconGeneral
BrandMarathon
ModelV-4830
CategoryLawn and Garden Equipment
LanguageEnglish

Summary

Section 1 - Operation

Introduction

Welcome message and overview of the manual's importance for safe operation and performance.

Pre-Operating Instructions

Essential safety checks and procedures to follow before operating the baler.

Control Panel Layouts

Diagrams and labels for control panels of various baler models (HD, LP, V-6030, V-4830).

Control Description

Detailed explanation of each button, switch, and light on the baler's control panel.

Making a Bale

Step-by-step guide on how to create a bale using different baler models.

Bale Tie Off and Ejection

Instructions for tying off and ejecting bales from various baler models.

Bale Tie Off/Eject Diagrams

Visual representations of the bale tie-off and ejection process for different models.

Tie Slot Cleaning Diagram

Diagram illustrating how to clean the tie slots using the provided tool.

Decals and Placement

Description and location of all warning decals for safety and compliance.

Section 2 - Maintenance

Lock-Out & Tag-Out Instructions

Detailed steps for safely locking out and tagging out the baler for maintenance.

Supporting of Platen

Instructions and warnings for securely supporting the platen before performing service.

Periodic Maintenance Schedule

Schedule and tasks for monthly, three-monthly, and annual maintenance of the baler.

Pressure Setting & Interlock Testing

Steps for setting hydraulic pressure and testing magnetic interlock systems.

Cylinder Removal Procedures

Guides for removing the hydraulic cylinder from various baler models.

Cylinder Rebuilding & Limit Switch Adjustment

Guides for rebuilding hydraulic cylinders and adjusting limit switches for bale size.

Feed Gate Latch Adjustment

Instructions for adjusting the feed gate latch tension and striker.

Principles of Operation

Explanation of how the baler operates for different model series.

Baler Specifications

Technical specifications and dimensions for various baler models.

Timer Adjustment

Guide on how to set the timer parameters using binary switches on the circuit board.

Electrical & Oil Charts

Reference charts for electrical components, wire sizes, and recommended oils.

Parts List

Comprehensive list of parts for different baler models with part numbers.

Panel Box Diagrams

Wiring diagrams for the panel boxes of HD, LP, V-6030, and V-4830 models.

Power Unit Diagrams

Diagrams of power unit components for various baler models.

Hydraulic Schematics

Schematics illustrating the hydraulic system layout for typical and specific baler models.

Trouble-Shooting Guide

Guide to diagnosing and solving common problems with the baler.

Section 3 - Installation

Off-Loading and Up-Ending

Procedures and safety requirements for safely moving and positioning the baler.

General Installation Guidelines

General guidelines for installing the baler, including site preparation and anchoring.

Electrical Installation

Instructions and precautions for connecting the baler to the electrical supply.

Start-Up Instructions

Steps to follow for initial start-up and checks after installation.

Related product manuals