EasyManua.ls Logo

Master Water Conditioning MP-NS-30T - Installation: Unit Positioning and Tank Loading; Combination Unit Positioning; Combination Unit Tank Loading

Master Water Conditioning MP-NS-30T
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Combination Unit Positioning:
1. Place combination unit in desired position, far enough from walls
and other obstructions to allow for servicing the unit.
2. Place the combination unit within reasonable access to a
grounded 115V/60 HZ circuit and a legal drain line connection.
Combination Unit Tank Loading:
1. Remove yellow caplug from top of tank. DO NOT CUT white
riser tube. Tube was prefitted at the factory.
2. Center the distributor and make sure it is resting on the bottom of
the tank. The top of the distributor pipe will extend above the top
of the tank (this was prefitted at the factory).
3. Cover the top opening of the distributor pipe before filling the
tank with media.
Model
NS-30 & 40T
4. Pour all filter media provided with the unit into the top of the tank.
See page one for your specific model number of unit to
determine the amount of media to load into the mineral tank.
5. Remove the material used to cover the top opening of the
distributor pipe.

Related product manuals