EasyManua.ls Logo

Master V- 550 - Assembly Steps 4 & 5; Trunk Line and Rail Link Assembly; Belt and Handlebar Installation

Master V- 550
80 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54
EN
Step 4
Connect the Trunk line(5) to the out wire of Sensor(82). Invaginate the Aluminum rail(73) in the Aluminum rail
link(62), then tightly assemble them together using Bolt(72) and Flat washer(8). Tighten the Aluminum rail
link(62) using Knob(50) to avoid a wobble of the Aluminum rail(73)and Main frame(37).
Step 5
Pull the Belt(41) out from the hole under the meter, hold it to avoid rebounding, and at the same time insert the
handlebar(40) to the Belt in place of paper(E). Please ensure all parts are fullly tight before using.

Related product manuals