10
model no. 062-3593-2 | contact us 1-800-689-9928
SAFETY GUIDELINES
WIRE SIZE
Consult a qualified electrician for proper wire size.
PRE-OPERATION: CHECK VOLTAGE AND PHASE
Before operating pump, check to make sure that the voltage and phase information
stamped on the pump’s identification plate matches the available power.
IDENTIFICATION PLATE
Note the numbers on the pump’s identification plate and record at the end of the manual
for future reference.
INSULATION TEST
Before the pump is put into service, an insulation (megger) test should be performed on it.
The ohm values as well as the volts and amps should be recorded.
PUMP TEST
After the pump has been properly wired and primed, it is advisable to check the system
by filling with liquid and allowing the pump to operate through its pumping cycle.
An automatic pressure controller has been installed on the pump. The automatic pressure
controller allows for automatic operation.
MAINTENANCE
No other maintenance is required.