STRENGTH: PREVENTIVE MAINTENANCE AND CLEANING CHECKLIST
Revision Date: December 2022
FUNCTIONAL TRAINERS AND MULTI-STATIONS – CABLE TENSIONING PROCEDURE
2. PRE-STRETCH OR “SETTHE CABLE
Attached a short handle to the ball end of the cable then pin 50-70 lbs. on the weight stack.
Do 5-10 reps at a rapid rate but do not allow the weight stack to crash down. You want to keep constant tension on the cable.
Check the cable end measurement. Proper tension should leave 10mm of clearance between the stopper and carriage or pulleys as shown in Step 6.a. in
the tightest conditions.
Adjust cable as needed.