16
FIG-16 Installing the Radio FIG-17 Screwing in the Radio
Wood Housing Wood Housing
15. Connect the control panel connectors. See FIG-18
FIG-18 Connecting control panel connectors
16. Make sure all steps are completed correctly. Plug in the power cord to your wall outlet.
Turn on the sauna at the control panel to confirm that the control panel is responding.
If the control panel responds accordingly, then proceed in putting the Roof Cover onto
the Roof Panel. Make sure to pull the power cord through the corresponding hole in
the Roof Cover. See FIG-19 & 20
FIG-19 Slip the power cord through Roof Cover FIG-20 Screw down Roof Cover