General Requirements
Storage and Handling
Siting the Megaflo eco (See Figure 1)
Figure 1 - Schematic Installation Details
5
T&P VALVE
8 BAR PRESSURE RELIEF VALVE
TUNDISH
DISCHARGE PIPE
DRAIN COCK
PRIMARY
RETURN
PRIMARY
FLOW
SECONDARY RETURN
TAPPING (IF REQUIRED,
INDIRECT CYLINDERS
ONLY)
MAINS WATER
SUPPLY
BALANCED COLD WATER
CONNECTION (IF REQUIRED)
3 BAR PRESSURE
REDUCING VALVE
STOP COCK (IF USED
IN THIS POSITION)
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818