EasyManua.ls Logo

MENZL Multitest plus - Lung-Governed Demand Valve-Closing Pressure; Medium-Pressure Test

MENZL Multitest plus
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Multitest plus
Operator's manual
- 13 -
Lung-governed demand valveclosing pressure
Detach the lung-governed demand valve from the equipment
connector.
Activate the positive-pressure function of the lung-governed
demand valve.
Connect the SCBA to the medium-pressure testing hose.
Connect the lung-governed demand valve to the medium-pressure testing
hose.
Connect the medium-pressure testing hose to the tester.
Open the breathing-air-cylinder valves.
Attach the lung-governed demand valve to the equipment
connector.
Release pressure via the relief valve for 5 seconds.
Perform the test against the specifications provided by the equipment
manufacturer.
Medium-pressure test
Do NOT attach the lung-governed demand valve to the equipment
connector for this test.
Connect the SCBA to the medium-pressure testing hose.
Connect the lung-governed demand valve to the medium-pressure testing
hose.
Connect the medium-pressure testing hose to the tester.
Connect the breathing-air cylinders.
Open the breathing-air-cylinder valves.
Briefly release pressure via the lung-governed demand valve.
Perform the test against the specifications provided by the equipment
manufacturer.