EasyManua.ls Logo

Mercury 5 SERIES - Page 51

Mercury 5 SERIES
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IGNITION SYSTEM
Page 2A-8 90-857138R1 MAY 2000
B. RESISTANCE TEST
1. Use an ohmmeter to perform the following primary winding test.
0.02-0.38
2. Use an ohmmeter to perform the following secondary winding test.
NOTE: High tension cables must have spark plug cap removed before testing. Cap contains
5k ohm resistor.
IMPORTANT: To remove spark plug cap from high tension leads, turn cap counter-
clockwise while applying slight outward pressure. DO NOT PULL HARD or lead may
be damaged. To install cap, turn cap clockwise threading cap onto high tension lead.
55852

Table of Contents

Related product manuals