Application Specific Controllers Technical Manual 636.3
UNT Controller Section
Technical Bulletin
Issue Date 0398
© 1998 Johnson Controls, Inc.
1
Code No. LIT-6363081 www.johnsoncontrols.com
Introduction Page 5
Description 5
Standards Compliance 6
Configuring the Controller 7
Using HVAC PRO for Windows Configuration Tool 7
Defining a UNT Control Device Object *7
Defining a UNT Control Device in Companion Software 9
Installation Procedures 11
Design Considerations *11
Tools Needed *11
Environmental Information 12
Mounting the Controller *12
Power Line Wiring Transient Noise Precautions *16
I/O and Communications Wiring Transient Noise Precautions 18
Wiring Details 19
Power Source and Loads *19
Wiring Precautions 21
Grounding and Isolation UNT110/111, 120/121, 140/141 22
Grounding and Isolation UNT110/111, UNT120/121,
and UNT140/141 with Separate Load Transformer *23
Unitary Controller (UNT)
* Indicates those sections where changes have occurred since the last printing.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Metasys UNT110-1 and is the answer not in the manual?

Metasys UNT110-1 Specifications

General IconGeneral
ModelUNT110-1
ApplicationHVAC and Building Automation
Input Voltage24 VAC
Enclosure RatingIP20
Communication ProtocolN2
Power Consumption5 VA
Operating Temperature-40°F to 158°F (-40°C to 70°C)
Relative Humiditynon-condensing
TypeUniversal Network Controller

Summary

Introduction

Configuring the Controller

Using HVAC PRO for Windows Configuration Tool

Explains how to use HVAC PRO for Windows to configure, commission, upload, and download the UNT database.

Installation Procedures

Power Line Wiring Transient Noise Precautions

Discusses precautions to prevent electrical noise from affecting the controller via power lines.

I;O and Communications Wiring Transient Noise Precautions

Ensures I/O wiring and N2 Bus are clean and free from electrical noise transients.

Wiring Details

Power Source and Loads

Details power transformer compliance, load limits, and precautions for powering UNTs and multiple controllers.

Grounding and Isolation UNT110;111, 120;121, 140;141

Explains earth ground connections for transformer secondaries and controller common terminals.

Grounding and Isolation UNT110;111, UNT120;121, and UNT140;141 with Separate Load Transformer

Details wiring for UNTs with separate load transformers, including jumper settings and isolation.

Terminal Designations

Analog Inputs

Binary Inputs

Binary Outputs (Triac Jumper Information)

UNT110;111 and UNT120;121 Triac Connections

Explains triac connections for UNT110/111 and UNT120/121 with separate load transformers.

UNT140;141 Binary Outputs

Analog Outputs

Zone Bus

Wiring to Unit Mounted Controls-UNT110;111 and UNT120;121

Binary Output Triac Connections on Terminal Strip Versions of the UNT140;141

Wiring to RLY050;002 Relays

UNT110;111 Wired to RLY050;002 with Isolated BOs

Wiring Sensors and Actuators

M100 C Motor Zone Bus Connection Using an R81 CAA-2 Board

R81 EAA-2 UNT Controller Interface

Example of HE-6300 Humidity Sensor Connection

Example of Temperature Sensor Connection

Example of Sharing a Sensor Among UNT Controllers

Networking the Controller

N2 Bus Overview

Introduces the N2 Bus for Metasys Network communication and its general principles.

Installing the N2 Bus

Setting the N2 Address

Provides instructions for setting the N2 address DIP switches for controller communication.

N2 Wiring to the Network Control Module

N2 Wiring to Companion

Zone Bus Communications

CBLPRO Description

Application Examples

Downloading;Commissioning

Commissioning Procedures

Outlines the steps for commissioning a UNT after mounting, wiring, and defining features.

Troubleshooting

Grounding UNT110;111, UNT120;121, and UNT140;141 with an Earth Ground Connection

Troubleshooting the UNT Controller with HVAC PRO for Windows

Troubleshooting the N2 Bus

Zone Bus Troubleshooting-HVAC PRO for Windows

Specifications

Appendix A: Precautions for Rooftop Installations

Recommended Transformers

Electrical Noise in Rooftop Units

Nuisance Resets in Rooftop Units

Considerations for Gas Ignition

Appendix B: UNT100;101

Grounding and Isolation UNT100;101

Power Transformer Isolation UNT100;101

Load Isolation UNT100;101

Related product manuals