EasyManua.ls Logo

Metkon FORCIMAT - Installation and Setup Guide; Unpacking and Contents Check

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
B. INSTALLATION & SET UP
1. Unpacking & Checking Contents of Package
Carefully unpack and check contents of the package. If any components are missing or damaged,
save the packing list and materials and advise the carrier and Metkon Instruments Inc. of the
discrepancy.
Carefully unpack and check that the following items have been received:
o Power Cable, 1.8 mt, 1 piece
o Air Hose, 1.5 mt, 1 piece
o Hex Key, 1.5 mt, 1 piece
WARNING! The FORCIMAT weighs from 16 kgs. please be sure that there are enough people
(at least 2) to safely lift the unit from the shipping carton. It is recommended to wear safety
shoes during transportation.
Carefully remove outer packing material. Refer to the packing documents for a list of items supplied.

Related product manuals