EasyManua.ls Logo

Midea EM720CRM-P00C - Page 16

Midea EM720CRM-P00C
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MOTOR TEST PROCEDURE
COMPONENTS TEST PROCEDURE RESULTS
Fan Motor
(Wire leads removed)
Measure the resistance.
(Ohm-meter scale:R×100)
Normal:Approx. 47
Abnormal: or Several
Turntable Motor
(Wire leads removed)
Measure the resistance.
(Ohm-meter scale:R×1000)
Normal:Approx. 3.2k
Abnormal:
or Several
NOTE:
z A MICROWAVE LEAKGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
z MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
z WHEN REMOVING THE WIRE LEADS FROM THE PARTS,BE SURE TO GRASP THE
CONNECTOR ,NOT THE WIRES.
5-8

Related product manuals