EasyManua.ls Logo

Midea MOU-12HDN1-Q

Midea MOU-12HDN1-Q
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation of Indoor Unit MCAC-UTSM-2008-05
76 Installation
2. Installation of Indoor Unit
2.1 Service Space
Installing Ø10 hanging screw bolts. (4 bolts)
1. Please refer to the following figures for the distance measurement between the screw bolts.
2. Please install with Ø10 hanging screw bolts.
3. The handling to the ceiling varies from the constructions, consult the construction personnels for the
specific procedures.
1) The size of the ceiling to be handled------ Do keep the ceiling flat. Consolidate the roof beam for
possible vibration.
2) Cut off the roof beam.
3) Strengthen the place that has been cut off, and consolidate the roof beam.
4. Carry out the pipe and line operation in the ceiling after finishing the installation of the main body. While
choosing where to start the operation, determine the direction of the pipes to be drawn out. Especially in
case there is a ceiling, position the refrigerant pipes, drain pipes, indoor & outdoor lines to the
connection places before hanging up the machine.
5. The installation of hanging screw bolts.
Wooden construction:
Put the square timber traversely over the roof beam, then install the hanging screw bolts.

Related product manuals