High Temperature Hydro Module
44 202003
Midea
VR High Temperature Hydraulic Module
11 Final Check and Test Run
11.1 Final Check
Before closing the switch of the unit, please read the following information:
When you complete installation of the unit and have performed all the necessary settings, ensure that all the metal
plates are closed. This can protect you from electrical parts and high-temperature parts inside the unit.
The electric control box cover plate can only be opened by an electrician who is certified for maintenance.
Discharge air in the system.
11.2 Test Run
Test run is described on the installation manual of the ODU. This is an automatic test run, which will last for more than 1 hour.