8.2 Post-Test Procedure
8.2.1 After testing the valve, close the pressure inlet valve to the test chamber, vent the pressure in the
test stand. Remove putty and drain water. Then remove the valve from the test fixture.
8.2.2 Wipe or blow away any remaining soapsuds and water used in the testing.
Figure 8-8 Blow Away Remaining Liquid
8.2.3 Install seal wires to adjustment nuts.
Figure 8-9 Apply Seal Wire