NOTICE
Welding or lightning strike current owing through the cell can damage it.
All electrical welding on the weighing system must be nished before mounting the load
cells.
When installing the load cell, immediately bypass the load cell with a exible copper
strap (included in the load cell equipment).
During any additional electrical welding work near the load cell:
- Disconnect the load cell cables.
- Bypass the load cell using the exible copper strap.
- Make sure that the grounding clamp of the welding set is tted as closely as possible
to the welding joint.
5 Installation Mini FLEX and Mini FLEXLOCK mounting kits PR 6012/01, ../31, ../41
Minebea Intec EN-17