EasyManua.ls Logo

Mitsubishi Heavy Industries SCM71ZM-S1 - (3) Defrost operation

Mitsubishi Heavy Industries SCM71ZM-S1
379 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(3) Defrost operation
(a)
(i)
(ii)
(iii)
(iv)
40
40
Tho-R
satisfied
Tho-A
2
(Tho-A)(Tho-R)
>
=
0.44 × (Tho-A) + A
A
4
6
6
Tho-A
15 °C
<
=
Tho-A < C
C
<
=
Tho-A
Tho-A < 15 °C
Tho-R
Max. 12 minutes and 50 seconds
Defrost operation
Heating operation
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
Hot keep operation
-20
-20 -15 -10 -5 0 5 10
-15
-10
-5
0
Outdoor air temperature ()
Outdoor heat exchanger temperature ()
Defrost operation
start
Defrost operation start temperature
(b)
(i)
(ii)
(iii)
Tho-R
Tho-R
Tho-R
2
2
20
º
1
conditions satisfied
(v)
(i)(ii) (iii) (v)
8
Max. 12 minutes and 50 seconds
Defrost operation
Heating operation
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
Hot keep operation
-20
-20 -15 -10 -5 0 5 10
-15
-10
-5
0
Outdoor air temperature ()
Outdoor heat exchanger temperature ()
Defrost operation
start
Defrost operation start temperature
-
193
-
'17 • SCM-T-225

Table of Contents

Related product manuals