117
9. Removing linear expansion valve
(1)Removetheservicepanel.(SeePhoto1)
(2)Removethetoppanel.(SeePhoto1)
(3)Removethefrontpanel.(SeePhoto1)
(4)Removetheconduitcoverandcordcover.(SeePhoto2)
(5)Removethebackpanel.(SeePhoto1)
(6)Removetheelectricalpartsbox.(SeePhoto5)
(7)Removethelinearexpansionvalvecoil.(SeePhoto10)
(8)Recoverrefrigerant.
(9)Removetheweldedpartoflinearexpansionvalve.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by
removing the back panel.
Note 3:
When installing the linear expansion valve, cover
it with a wet cloth to prevent it from heating (250˚F
or more), then braze the pipes so that the inside of
pipes are not oxidized.
8. Removing the 4-way valve
(1)Removetheservicepanel.(SeePhoto1)
(2)Removethetoppanel.(SeePhoto1)
(3)Removethefrontpanel.(SeePhoto1)
(4)Removetheconduitcoverandcordcover.(SeePhoto2)
(5)Removethebackpanel.(SeePhoto1)
(6)Removetheelectricalpartsbox.(SeePhoto5)
(7)Removethe4-wayvalvecoil(SeePhoto8)
(8)Recoverrefrigerant.
(9)Removetheweldedpartoffour-wayvalve.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by
removing the right side panel.
Note 3: When installing the four-way valve, cover it with
a wet cloth to prevent it from heating (250˚F or
more), then braze the pipes so that the inside of
pipes are not oxidized.
Photo 10
Photo 11
10. Removing the high pressure switch (63H)
(1)Removetheservicepanel.(SeePhoto1)
(2)Removethetoppanel.(SeePhoto1)
(3)Removethefrontpanel.(SeePhoto1)
(4)Removetheconduitcoverandcordcover.(SeePhoto2)
(5)Removethebackpanel.(SeePhoto1)
(6)Removetheelectricalpartsbox.(SeePhoto5)
(7)Pullouttheleadwireofhighpressureswitch.
(8)Recoverrefrigerant.
(9)Removetheweldedpartofhighpressureswitch.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by
removing the back panel.
Note 3: When installing the high pressure switch, cover it
with a wet cloth to prevent it from heating (210˚F
or more), then braze the pipes so that the inside
of pipes are not oxidized.
Reactorfixingscrews
Highpressure
switch(63H)
Reactorfixingscrews
Reactor
(ACL)
Electrical
partsbox
11. Removing the reactor (ACL)
(1)Removetheservicepanel.(SeePhoto1)
(2)Removethetoppanel.(SeePhoto1)
(3)Removethefrontpanel.(SeePhoto1)
(4)Removethebackpanel.(SeePhoto1)
(5)Remove3reactorfixingscrews(4×20)andremovethe
reactor.
Note:Thereactorisattachedtotherearoftheelectricalpartsbox.
Photo 12
Chargeplug
4-wayvalve
Linearexpansion
valvecoil(LEV-A)
Linearexpansionvalve
4-wayvalvecoil
fixingscrew
4-wayvalvecoil
(21S4)
OPERATING PROCEDURE PHOTOS