127
PHOTOS
11. Removing the reactor (DCL) and capacitor (CE)
(1)Removetheservicepanel.(SeeFigure1)
(2)Removethetoppanel.(SeeFigure1)
(3)Removetheelectricalpartsbox.(SeePhoto3)
<Removingthereactor>
(4)Remove4reactorfixingscrews(4×10)andremovethe
reactor.
<Removingthecapacitor>
(4)Remove2capacitorbandfixingscrews(4×10)and
removethecapacitor.
Note:Thereactorandcapacitorisattachedtotherearofthe
electricalpartsbox.
Capacitorband
fixingscrews
Photo 8
Photo 9
Reactor
fixing
screws
Reactor
fixing
screws
Reactor
(DCL)
Electricalpartsbox
Capacitor(CE)
Highpressure
switch(63H)
10. Removing the high pressure switch (63H)
(1)Removetheservicepanel.(Seephoto1)
(2)Removethetoppanel.(Seephoto1)
(3)
Remove3rightsidepanelfixingscrews(5×12)intherear
oftheunitandremovetherightsidepanel.
(4)Pullouttheleadwireofhighpressureswitch.
(5)Recoverrefrigerant.
(6)Removetheweldedpartofhighpressureswitch.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by remov-
ing the right side panel.
Note 3: When installing the high pressure switch, cover it
with a wet cloth to prevent it from heating (210°F
or more), then braze the pipes so that the inside of
pipes are not oxidized.
OPERATING PROCEDURE