EasyManua.ls Logo

Mitsubishi PUY-A36NHA6 - Page 127

Mitsubishi PUY-A36NHA6
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
127
PHOTOS
11. Removing the reactor (DCL) and capacitor (CE)
(1)Removetheservicepanel.(SeeFigure1)
(2)Removethetoppanel.(SeeFigure1)
(3)Removetheelectricalpartsbox.(SeePhoto3)
<Removingthereactor>
(4)Remove4reactorfixingscrews(4×10)andremovethe
reactor.
<Removingthecapacitor>
(4)Remove2capacitorbandfixingscrews(4×10)and
removethecapacitor.
Note:Thereactorandcapacitorisattachedtotherearofthe
electricalpartsbox.
Capacitorband
fixingscrews
Photo 8
Photo 9
Reactor
fixing
screws
Reactor
fixing
screws
Reactor
(DCL)
Electricalpartsbox
Capacitor(CE)
Highpressure
switch(63H)
10. Removing the high pressure switch (63H)
(1)Removetheservicepanel.(Seephoto1)
(2)Removethetoppanel.(Seephoto1)
(3)
Remove3rightsidepanelfixingscrews(5×12)intherear
oftheunitandremovetherightsidepanel.
(4)Pullouttheleadwireofhighpressureswitch.
(5)Recoverrefrigerant.
(6)Removetheweldedpartofhighpressureswitch.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by remov-
ing the right side panel.
Note 3: When installing the high pressure switch, cover it
with a wet cloth to prevent it from heating (210°F
or more), then braze the pipes so that the inside of
pipes are not oxidized.
OPERATING PROCEDURE
OCH577A

Related product manuals